from Surrey Mirror Surrey News RSS feed http://www.surreymirror.co.uk/angry-graffiti-left-at-flanchford-bridge-as-repair-project-enters-ninth-month/story-30107656-detail/story.html
My name is Howard, or Howie as some of you may know me as. I live in Farnham, Surrey with my wife. I work as an architectural designer, which I really enjoy! I get the chance to design new buildings and develop new ways of using existing buildings. .
Friday, 3 February 2017
Angry graffiti left at Flanchford Bridge as repairs still haven't...
Graffiti claiming that the eight months of roadworks to repair Flanchford Bridge have "ruined" lives has been sprayed onto temporary buildings at the site.Work to repair the bridge, badly damaged by floods in December 2013, was originally scheduled to last six months but delays to the project have meant that the scheduled completion date is now February 24.Frustrations appear to have boiled over with someone who would normally use the bridge on Flanchford Road, which links Leigh and...
from Surrey Mirror Surrey News RSS feed http://www.surreymirror.co.uk/angry-graffiti-left-at-flanchford-bridge-as-repair-project-enters-ninth-month/story-30107656-detail/story.html
from Surrey Mirror Surrey News RSS feed http://www.surreymirror.co.uk/angry-graffiti-left-at-flanchford-bridge-as-repair-project-enters-ninth-month/story-30107656-detail/story.html
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment